{"id":11970,"date":"2022-09-27T12:22:38","date_gmt":"2022-09-27T18:22:38","guid":{"rendered":"https:\/\/mexpatrealtors.com\/?p=11970"},"modified":"2022-11-13T11:13:43","modified_gmt":"2022-11-13T17:13:43","slug":"construction-of-puerto-vallarta-airports-terminal-2-begins","status":"publish","type":"post","link":"http:\/\/mexpatrealtors.com\/fr\/construction-of-puerto-vallarta-airports-terminal-2-begins\/","title":{"rendered":"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins"},"content":{"rendered":"<p>Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.<\/p>\n\n\n\n<p>\u201cWith this event, the work that reinforces the commitment of Grupo Aeroportuario del Pac\u00edfico to contribute to the economic and social development of Mexico will be formally initiated,\u201d the statement added.<\/p>\n\n\n\n<p>The new terminal will span more than 61,200 square meters and increase the number of jetways and checked baggage screening and security areas at the airport by 50%. In other words, this work will give passengers more space and make their trip more enjoyable.<\/p>\n\n\n\n<p>It will also be the first Zero Energy airport terminal in Latin America. This will be achieved within 7.5 years through several strategies, which include: the use of solar panels on the roof of the building, which will lower energy consumption by 40% compared to other airports with the same characteristics; and efficient water management through the reuse of 100% of the gray, black and blue water generated inside and outside the terminal, which will reduce water consumption by 35%; among other elements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"715\" height=\"346\" src=\"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering2.png\" alt=\"\" class=\"wp-image-11972\" srcset=\"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering2.png 715w, https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering2-300x145.png 300w\" sizes=\"(max-width: 715px) 100vw, 715px\" \/><\/figure>\n\n\n\n<p>It should be remembered that the&nbsp;<a href=\"https:\/\/banderasnews.com\/gap-to-invest-us1bn-in-mexican-airports\/\" target=\"_blank\" rel=\"noreferrer noopener\">investments GAP committed to<\/a>&nbsp;the Puerto Vallarta airport in the 2020-2024 Master Development Plan (PMD) exceeded 3.26 billion pesos and, during the next few years, most of this amount will be invested. In addition, in the five-year period between 2025-2029, an additional 1.3 billion pesos will be invested in the airport\u2019s expansion.<\/p>\n\n\n\n<p>Within the investment amount, more than 1.7 billion pesos stand out for the new Terminal Building and capacity and quality projects on the runway, platform, taxi ways, roads, parking lots, tower, among other facilities to optimize operations; in addition to 800 million pesos in state-of-the-art equipment such as specialized vehicles for the Rescue and Fire Extinction Service (SSEI), security equipment and the renovation of aerocars for passenger transportation.<\/p>\n\n\n\n<p>According to GAP reports, the Puerto Vallarta airport\u2019s Terminal 2 will tentatively be completed in two years, when it will have the capacity to mobilize 4.5 million passengers per year.<\/p>\n\n\n\n<p><em>Sources:&nbsp;<a href=\"https:\/\/contralinea.net\/el-lunes-inicia-construccion-de-la-terminal-2-del-aeropuerto-de-vallarta\/\" target=\"_blank\" rel=\"noreferrer noopener\">Contra L\u00ednea<\/a>&nbsp;\u2022&nbsp;<a href=\"https:\/\/www.milenio.com\/negocios\/puerto-vallarta-terminal-aerea-zero-energy\" target=\"_blank\" rel=\"noreferrer noopener\">Milenio<\/a><\/em><\/p>\n\n\n\n<p>Pour les questions relatives \u00e0\u00a0<strong><em><a href=\"http:\/\/mexpatrealtors.com\/fr\/\">biens immobiliers \u00e0 Puerto Vallarta<\/a><\/em><\/strong>, ou\u00a0<strong><em><a href=\"http:\/\/mexpatrealtors.com\/fr\/\">real estate in Bahia de Banderas<\/a><\/em><\/strong>,\u00a0<strong><em><a href=\"http:\/\/mexpatrealtors.com\/fr\/\">property management<\/a><\/em><\/strong>,\u00a0<strong><em><a href=\"http:\/\/mexpatrealtors.com\/fr\/\">buying houses in Puerto Vallarta<\/a><\/em><\/strong>,\u00a0<strong><em><a href=\"http:\/\/mexpatrealtors.com\/fr\/\">buying condos in Puerto Vallarta<\/a><\/em><\/strong>\u00a0or the surrounding areas Mexpat Realtors in Puerto Vallarta is a great resource call them or go to their website\u00a0<a href=\"http:\/\/mexpatrealtors.com\/fr\/\">www.mexpatrealtors.com<\/a>\u00a0for more information<\/p>","protected":false},"excerpt":{"rendered":"<p>Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities. \u201cWith this event, the work that reinforces [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11971,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[224,45],"tags":[],"post_folder":[],"class_list":["post-11970","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-puerto-vallarta"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mexpat Realtors<\/title>\n<meta name=\"description\" content=\"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mexpatrealtors.com\/fr\/construction-of-puerto-vallarta-airports-terminal-2-begins\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins - Mexpat Realtors\" \/>\n<meta property=\"og:description\" content=\"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mexpatrealtors.com\/fr\/construction-of-puerto-vallarta-airports-terminal-2-begins\/\" \/>\n<meta property=\"og:site_name\" content=\"Mexpat Realtors\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-27T18:22:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-11-13T17:13:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Luke Kost\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins - Mexpat Realtors\" \/>\n<meta name=\"twitter:description\" content=\"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luke Kost\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/\"},\"author\":{\"name\":\"Luke Kost\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#\\\/schema\\\/person\\\/9a240ee7e8da55d1a8a774916f0d3133\"},\"headline\":\"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins\",\"datePublished\":\"2022-09-27T18:22:38+00:00\",\"dateModified\":\"2022-11-13T17:13:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/\"},\"wordCount\":425,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/PVR-terminal2-rendering.jpg\",\"articleSection\":[\"News\",\"Puerto Vallarta\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/\",\"url\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/\",\"name\":\"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins - Mexpat Realtors\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/PVR-terminal2-rendering.jpg\",\"datePublished\":\"2022-09-27T18:22:38+00:00\",\"dateModified\":\"2022-11-13T17:13:43+00:00\",\"description\":\"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/PVR-terminal2-rendering.jpg\",\"contentUrl\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/PVR-terminal2-rendering.jpg\",\"width\":1000,\"height\":563},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/construction-of-puerto-vallarta-airports-terminal-2-begins\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mexpatrealtors.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#website\",\"url\":\"https:\\\/\\\/mexpatrealtors.com\\\/\",\"name\":\"Mexpat Realtors\",\"description\":\"Best Puerto Vallarta Realtors\",\"publisher\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mexpatrealtors.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#organization\",\"name\":\"Mexpat Realtors\",\"url\":\"https:\\\/\\\/mexpatrealtors.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/MEXPAT-LOGO-HIGH-DEFINITION-scaled.png\",\"contentUrl\":\"https:\\\/\\\/mexpatrealtors.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/MEXPAT-LOGO-HIGH-DEFINITION-scaled.png\",\"width\":2560,\"height\":866,\"caption\":\"Mexpat Realtors\"},\"image\":{\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mexpatrealtors.com\\\/#\\\/schema\\\/person\\\/9a240ee7e8da55d1a8a774916f0d3133\",\"name\":\"Luke Kost\",\"sameAs\":[\"http:\\\/\\\/mexpatrealtors.com\"],\"url\":\"http:\\\/\\\/mexpatrealtors.com\\\/fr\\\/author\\\/lukekost\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Les agents immobiliers Mexpat sont des experts","description":"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mexpatrealtors.com\/fr\/construction-of-puerto-vallarta-airports-terminal-2-begins\/","og_locale":"fr_FR","og_type":"article","og_title":"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins - Mexpat Realtors","og_description":"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.","og_url":"https:\/\/mexpatrealtors.com\/fr\/construction-of-puerto-vallarta-airports-terminal-2-begins\/","og_site_name":"Mexpat Realtors","article_published_time":"2022-09-27T18:22:38+00:00","article_modified_time":"2022-11-13T17:13:43+00:00","og_image":[{"width":1000,"height":563,"url":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","type":"image\/jpeg"}],"author":"Luke Kost","twitter_card":"summary_large_image","twitter_title":"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins - Mexpat Realtors","twitter_description":"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.","twitter_image":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","twitter_misc":{"\u00c9crit par":"Luke Kost","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#article","isPartOf":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/"},"author":{"name":"Luke Kost","@id":"https:\/\/mexpatrealtors.com\/#\/schema\/person\/9a240ee7e8da55d1a8a774916f0d3133"},"headline":"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins","datePublished":"2022-09-27T18:22:38+00:00","dateModified":"2022-11-13T17:13:43+00:00","mainEntityOfPage":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/"},"wordCount":425,"commentCount":0,"publisher":{"@id":"https:\/\/mexpatrealtors.com\/#organization"},"image":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","articleSection":["News","Puerto Vallarta"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/","url":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/","name":"D\u00e9but de la construction du terminal 2 de l'a\u00e9roport de Puerto Vallarta - Mexpat Realtors","isPartOf":{"@id":"https:\/\/mexpatrealtors.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#primaryimage"},"image":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","datePublished":"2022-09-27T18:22:38+00:00","dateModified":"2022-11-13T17:13:43+00:00","description":"Grupo Aeroportuario del Pac\u00edfico (GAP) on Wednesday announced that construction of the new terminal building at the Gustavo D\u00edaz Ordaz International Airport in Puerto Vallarta will begin on Monday, August 29, with an 8:30 am ground breaking ceremony that will be attended by municipal, state and federal authorities.","breadcrumb":{"@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#primaryimage","url":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","contentUrl":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","width":1000,"height":563},{"@type":"BreadcrumbList","@id":"https:\/\/mexpatrealtors.com\/construction-of-puerto-vallarta-airports-terminal-2-begins\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mexpatrealtors.com\/"},{"@type":"ListItem","position":2,"name":"Construction of Puerto Vallarta Airport\u2019s Terminal 2 Begins"}]},{"@type":"WebSite","@id":"https:\/\/mexpatrealtors.com\/#website","url":"https:\/\/mexpatrealtors.com\/","name":"Les agents immobiliers Mexpat sont des experts","description":"Best Puerto Vallarta Realtors","publisher":{"@id":"https:\/\/mexpatrealtors.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mexpatrealtors.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/mexpatrealtors.com\/#organization","name":"Les agents immobiliers Mexpat sont des experts","url":"https:\/\/mexpatrealtors.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/mexpatrealtors.com\/#\/schema\/logo\/image\/","url":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2020\/02\/MEXPAT-LOGO-HIGH-DEFINITION-scaled.png","contentUrl":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2020\/02\/MEXPAT-LOGO-HIGH-DEFINITION-scaled.png","width":2560,"height":866,"caption":"Mexpat Realtors"},"image":{"@id":"https:\/\/mexpatrealtors.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mexpatrealtors.com\/#\/schema\/person\/9a240ee7e8da55d1a8a774916f0d3133","name":"Luke Kost","sameAs":["http:\/\/mexpatrealtors.com"],"url":"http:\/\/mexpatrealtors.com\/fr\/author\/lukekost\/"}]}},"jetpack_featured_media_url":"https:\/\/mexpatrealtors.com\/wp-content\/uploads\/2022\/09\/PVR-terminal2-rendering.jpg","_links":{"self":[{"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/posts\/11970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/comments?post=11970"}],"version-history":[{"count":2,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/posts\/11970\/revisions"}],"predecessor-version":[{"id":12999,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/posts\/11970\/revisions\/12999"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/media\/11971"}],"wp:attachment":[{"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/media?parent=11970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/categories?post=11970"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/tags?post=11970"},{"taxonomy":"post_folder","embeddable":true,"href":"http:\/\/mexpatrealtors.com\/fr\/wp-json\/wp\/v2\/post_folder?post=11970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}